title: Compliance with the requirements for electrical safety in Maharashtra
description: Maharastra has a new regulation for electrical safety that recommends moving from manual elctrical audits to automated and real time electrical audits
image: https://blog.powereasy.in/hubfs/smart%20optimizer%20png-1.png
---

[![pe logo](https://blog.powereasy.in/hs-fs/hubfs/pe%20logo.jpg?width=650&height=178&name=pe%20logo.jpg "pe logo")](https://www.powereasy.in)

- [HOME](https://www.powereasy.in/)

# POWEReasy Blog

## [Compliance with the requirements for electrical safety in Maharashtra](https://blog.powereasy.in/compliance-with-the-requirements-for-electrical-safety-in-maharashtra)

 Oct 15, 2021 8:10:35 AM / by [Tejas K Jhaveri](https://blog.powereasy.in/author/tejas-k-jhaveri)

- [Tweet](https://twitter.com/share)

**Introduction to Electrical Audits and the need for automation**

Comprehensive electrical safety audit can provide a thorough review of the electrical system. This could identify potential electrical hazards, flaws in the design system, maintenance system, etc. At present electrical safety audits are carried out as per Central Electricity Authority 2010 Regulations for Safety and Electricity Supply. Manual audits are performed at specific schedules and perform the  job of inspection, testing and periodic tests in a facility. The fact is that compliance with the latest requirements for electrical  safety in hospital and public places in Maharashtra across all facilities will take 20 years if it were to be performed manually. A new form of safety audits is now possible via [automation](/automating-essential-services%3Eelectrical%20audit), where devices like [Smart DBs](https://lp1.powereasy.in/smart_db) & [Smart Optimizers](https://lp1.powereasy.in/smart_optimizer) offer automated electrical audit and real time protection. These automated electrical time audits are made mandatory for all hospital and public spaces in Maharashtra as per Maharashtra Govt circular No: 2021/114/urja5.  

 

**What is made mandatory by Maharashtra Govt ?**

In response to the several fire incidents in hospital and temporary COVID centers across India, the Ministry of Home Affairs had circulated guidelines on 4th May 2021: F. No. VIII-110111/02 (Adv)/2020-DGCD (F). 

Maharashtra had decided to implement it’s own protocol for electrical safety in GR No: 2021/114/urja5. In order to prevent fires and in accordance with Central Electricity Authority 2010 Regulations for Safety and Electricity Supply, the following 8 items are mandated :

1. Proper selection and quality checks of cables, distribution boards, meter rooms and panels
2. Regular inspection and checks
3. Following standards for earthing as per IS3043
4. Use of ELCB/RCCB
5. Use of personnel protective equipment 
6. Ensure operation at correct voltage levels
7. Use of smoke alarms and fire fighting systems in high rise buildings
8. Use of IOT based electrical parameter monitoring and reporting on cloud

 

**What type of  IOT based devices are currently available? **

The latest government regulations require the need to monitor 14 electrical issues such as arcing, short circuit, over current, earth leakage, over voltage, under voltage, phase loss, phase reversal, neutral loss, voltage quality, loads with low power factor, harmonics, inrush currents and unbalanced currents. 

POWEReasy range of IOT devices by Jhaveri Power Labs not only cover 14 of these electricity issues but is NABL approved to identify 20 types of electrical faults and provide early detection of electrical faults with root cause analysis. The key advantage of implementing the POWEReasy solution is the proactive support that monitors electricity usage remotely from a command center. This is the only way to ensure not only early identification but a constant follow up to actually fixing the problem

 

POWEReasy Smart Systems Enabling Audits & Corrections via the Command Center

![Screenshot 2021-10-15 at 5.34.05 PM](https://blog.powereasy.in/hs-fs/hubfs/Screenshot%202021-10-15%20at%205.34.05%20PM.png?width=672&name=Screenshot%202021-10-15%20at%205.34.05%20PM.png)

 

**What is the implementation timeline for IOT based electrical protection?**

| **Timeline** | **Step** | **JPL resources** | **Client resources** |
| --- | --- | --- | --- |
| Day 1 | Site audit via VC | Command center | Site representative |
| Day 1 - 2 | SLD Creation | Command center |   |
| Day 3 - 4 | SLD finalization & shutdown planning | Service engineer | Admin, site representative, electrician |
| Day 4 – 6 | Site Preparation |   | Site representative, electrician |
| Day 7 | Installation & Commissioning | Technician, command center | Site representative, electrician |
| Day 7 – 14 | Remote monitoring | Command center |   |
| Day 16 | Weekly audit report with recommendations | Service engineer |   |
| Day 16 – 18 | Corrections at site based on recommendations | Technician, command center | Site representative, electrician |
| Day 18 – 20 | Remote monitoring | Command center |   |
| Day 21 | Handover of site after documenting corrections and open issues | Service engineer | Admin, site representative, electrician |

 

 Tags: [Improving safety with automation](https://blog.powereasy.in/topic/improving-safety-with-automation)

![Tejas K Jhaveri](https://blog.powereasy.in/hs-fs/hubfs/DSC_0924.jpg?width=100&height=100&name=DSC_0924.jpg)

#### Written by [Tejas K Jhaveri](https://blog.powereasy.in/author/tejas-k-jhaveri)

Inventor of POWEReasy | Building products for 7 Billion globally | Safe and efficient electricity at the last mile

<https://facebook.com/POWEReasy-1080500812148140/> <https://www.linkedin.com/in/tejas-jhaveri-69232121/> <https://twitter.com/JhaveriLabs>

### Subscribe to Email Updates

- [Recent](https://blog.powereasy.in/compliance-with-the-requirements-for-electrical-safety-in-maharashtra#tab-1)
- [Popular](https://blog.powereasy.in/compliance-with-the-requirements-for-electrical-safety-in-maharashtra#tab-2)
- [Categories](https://blog.powereasy.in/compliance-with-the-requirements-for-electrical-safety-in-maharashtra#tab-3)

### Lists by Topic

- [Enhancing stability of electrical systems (3)](https://blog.powereasy.in/tag/enhancing-stability-of-electrical-systems)
- [Improving safety with automation (3)](https://blog.powereasy.in/tag/improving-safety-with-automation)
- [Automating essential services (2)](https://blog.powereasy.in/tag/automating-essential-services)
- [Critical Overvoltage Fault Corrective Plan (2)](https://blog.powereasy.in/tag/critical-overvoltage-fault-corrective-plan)
- [Critical Voltage Harmonics Fault Corrective Plan (2)](https://blog.powereasy.in/tag/critical-voltage-harmonics-fault-corrective-plan)
- [Identifying & Correcting Electrical Warnings (2)](https://blog.powereasy.in/tag/identifying-correcting-electrical-warnings)
- [Adopting smart electricity sustainability (1)](https://blog.powereasy.in/tag/adopting-smart-electricity-sustainability)
- [Arcing Faults Corrective Plan (1)](https://blog.powereasy.in/tag/arcing-faults-corrective-plan)
- [CIRCUIT BREAKERS: IS THAT ALL YOU GOT? (1)](https://blog.powereasy.in/tag/circuit-breakers-is-that-all-you-got)
- [Critical Earth Leakage Fault Corrective Plan (1)](https://blog.powereasy.in/tag/critical-earth-leakage-fault-corrective-plan)
- [Critical Earth Voltage Fault Corrective Plan (1)](https://blog.powereasy.in/tag/critical-earth-voltage-fault-corrective-plan)
- [Critical Undervoltage Fault Corrective Plan (1)](https://blog.powereasy.in/tag/critical-undervoltage-fault-corrective-plan)
- [Does stabilizer reduce electricity bill? (1)](https://blog.powereasy.in/tag/does-stabilizer-reduce-electricity-bill)
- [Earth Leakage Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/earth-leakage-warnings-corrective-plan)
- [Earth Voltage Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/earth-voltage-warnings-corrective-plan)
- [Electrical fire risks (1)](https://blog.powereasy.in/tag/electrical-fire-risks)
- [GREEN, GREEN, FAIRY QUEEN (1)](https://blog.powereasy.in/tag/green-green-fairy-queen)
- [HEATING OF BASIC ELECTRONIC EQUIPMENT (1)](https://blog.powereasy.in/tag/heating-of-basic-electronic-equipment)
- [ICE BOX BABY AND OTHER JUGAADS (1)](https://blog.powereasy.in/tag/ice-box-baby-and-other-jugaads)
- [INDIA: MAKE IT OR BREAK IT (1)](https://blog.powereasy.in/tag/india-make-it-or-break-it)
- [Identifying & Correcting Electrical Faults (1)](https://blog.powereasy.in/tag/identifying-correcting-electrical-faults)
- [Inrush Current Warning Corrective Plan (1)](https://blog.powereasy.in/tag/inrush-current-warning-corrective-plan)
- [Loose Connections Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/loose-connections-warnings-corrective-plan)
- [Neutral Loss Fault Correction Plan (1)](https://blog.powereasy.in/tag/neutral-loss-fault-correction-plan)
- [Overload Warnings Corrective (1)](https://blog.powereasy.in/tag/overload-warnings-corrective)
- [Overvoltage Warning Corrective Plan (1)](https://blog.powereasy.in/tag/overvoltage-warning-corrective-plan)
- [Phase Loss Fault Correction Plan (1)](https://blog.powereasy.in/tag/phase-loss-fault-correction-plan)
- [Phase Reversal Fault Correction Plan (1)](https://blog.powereasy.in/tag/phase-reversal-fault-correction-plan)
- [Power factor Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/power-factor-warnings-corrective-plan)
- [Reverse Current Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/reverse-current-warnings-corrective-plan)
- [Short Term Warning Corrective Plan (1)](https://blog.powereasy.in/tag/short-term-warning-corrective-plan)
- [Shortcircuit / Overload Fault Corrective Plan (1)](https://blog.powereasy.in/tag/shortcircuit-overload-fault-corrective-plan)
- [Simplify adoption of smart electricity (1)](https://blog.powereasy.in/tag/simplify-adoption-of-smart-electricity)
- [THE PRICE OF PROTECTION (1)](https://blog.powereasy.in/tag/the-price-of-protection)
- [The different type of Voltage Stabilizers? (1)](https://blog.powereasy.in/tag/the-different-type-of-voltage-stabilizers)
- [Time to replace your servo voltage stabilizer (1)](https://blog.powereasy.in/tag/time-to-replace-your-servo-voltage-stabilizer)
- [Unbalanced Currents Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/unbalanced-currents-warnings-corrective-plan)
- [Under Voltage Warning Corrective Plan (1)](https://blog.powereasy.in/tag/under-voltage-warning-corrective-plan)
- [Voltage Harmonics Warning Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-harmonics-warning-corrective-plan)
- [Voltage Surge Fault Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-surge-fault-corrective-plan)
- [Voltage Unbalance Warning Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-unbalance-warning-corrective-plan)
- [Voltage Variation Warning Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-variation-warning-corrective-plan)
- [WHILE YOU WERE SLEEPING (1)](https://blog.powereasy.in/tag/while-you-were-sleeping)
- [What is Smart Electricity (1)](https://blog.powereasy.in/tag/what-is-smart-electricity)

see all

### Posts by Topic

- [Enhancing stability of electrical systems (3)](https://blog.powereasy.in/tag/enhancing-stability-of-electrical-systems)
- [Improving safety with automation (3)](https://blog.powereasy.in/tag/improving-safety-with-automation)
- [Automating essential services (2)](https://blog.powereasy.in/tag/automating-essential-services)
- [Critical Overvoltage Fault Corrective Plan (2)](https://blog.powereasy.in/tag/critical-overvoltage-fault-corrective-plan)
- [Critical Voltage Harmonics Fault Corrective Plan (2)](https://blog.powereasy.in/tag/critical-voltage-harmonics-fault-corrective-plan)
- [Identifying & Correcting Electrical Warnings (2)](https://blog.powereasy.in/tag/identifying-correcting-electrical-warnings)
- [Adopting smart electricity sustainability (1)](https://blog.powereasy.in/tag/adopting-smart-electricity-sustainability)
- [Arcing Faults Corrective Plan (1)](https://blog.powereasy.in/tag/arcing-faults-corrective-plan)
- [CIRCUIT BREAKERS: IS THAT ALL YOU GOT? (1)](https://blog.powereasy.in/tag/circuit-breakers-is-that-all-you-got)
- [Critical Earth Leakage Fault Corrective Plan (1)](https://blog.powereasy.in/tag/critical-earth-leakage-fault-corrective-plan)
- [Critical Earth Voltage Fault Corrective Plan (1)](https://blog.powereasy.in/tag/critical-earth-voltage-fault-corrective-plan)
- [Critical Undervoltage Fault Corrective Plan (1)](https://blog.powereasy.in/tag/critical-undervoltage-fault-corrective-plan)
- [Does stabilizer reduce electricity bill? (1)](https://blog.powereasy.in/tag/does-stabilizer-reduce-electricity-bill)
- [Earth Leakage Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/earth-leakage-warnings-corrective-plan)
- [Earth Voltage Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/earth-voltage-warnings-corrective-plan)
- [Electrical fire risks (1)](https://blog.powereasy.in/tag/electrical-fire-risks)
- [GREEN, GREEN, FAIRY QUEEN (1)](https://blog.powereasy.in/tag/green-green-fairy-queen)
- [HEATING OF BASIC ELECTRONIC EQUIPMENT (1)](https://blog.powereasy.in/tag/heating-of-basic-electronic-equipment)
- [ICE BOX BABY AND OTHER JUGAADS (1)](https://blog.powereasy.in/tag/ice-box-baby-and-other-jugaads)
- [INDIA: MAKE IT OR BREAK IT (1)](https://blog.powereasy.in/tag/india-make-it-or-break-it)
- [Identifying & Correcting Electrical Faults (1)](https://blog.powereasy.in/tag/identifying-correcting-electrical-faults)
- [Inrush Current Warning Corrective Plan (1)](https://blog.powereasy.in/tag/inrush-current-warning-corrective-plan)
- [Loose Connections Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/loose-connections-warnings-corrective-plan)
- [Neutral Loss Fault Correction Plan (1)](https://blog.powereasy.in/tag/neutral-loss-fault-correction-plan)
- [Overload Warnings Corrective (1)](https://blog.powereasy.in/tag/overload-warnings-corrective)
- [Overvoltage Warning Corrective Plan (1)](https://blog.powereasy.in/tag/overvoltage-warning-corrective-plan)
- [Phase Loss Fault Correction Plan (1)](https://blog.powereasy.in/tag/phase-loss-fault-correction-plan)
- [Phase Reversal Fault Correction Plan (1)](https://blog.powereasy.in/tag/phase-reversal-fault-correction-plan)
- [Power factor Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/power-factor-warnings-corrective-plan)
- [Reverse Current Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/reverse-current-warnings-corrective-plan)
- [Short Term Warning Corrective Plan (1)](https://blog.powereasy.in/tag/short-term-warning-corrective-plan)
- [Shortcircuit / Overload Fault Corrective Plan (1)](https://blog.powereasy.in/tag/shortcircuit-overload-fault-corrective-plan)
- [Simplify adoption of smart electricity (1)](https://blog.powereasy.in/tag/simplify-adoption-of-smart-electricity)
- [THE PRICE OF PROTECTION (1)](https://blog.powereasy.in/tag/the-price-of-protection)
- [The different type of Voltage Stabilizers? (1)](https://blog.powereasy.in/tag/the-different-type-of-voltage-stabilizers)
- [Time to replace your servo voltage stabilizer (1)](https://blog.powereasy.in/tag/time-to-replace-your-servo-voltage-stabilizer)
- [Unbalanced Currents Warnings Corrective Plan (1)](https://blog.powereasy.in/tag/unbalanced-currents-warnings-corrective-plan)
- [Under Voltage Warning Corrective Plan (1)](https://blog.powereasy.in/tag/under-voltage-warning-corrective-plan)
- [Voltage Harmonics Warning Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-harmonics-warning-corrective-plan)
- [Voltage Surge Fault Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-surge-fault-corrective-plan)
- [Voltage Unbalance Warning Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-unbalance-warning-corrective-plan)
- [Voltage Variation Warning Corrective Plan (1)](https://blog.powereasy.in/tag/voltage-variation-warning-corrective-plan)
- [WHILE YOU WERE SLEEPING (1)](https://blog.powereasy.in/tag/while-you-were-sleeping)
- [What is Smart Electricity (1)](https://blog.powereasy.in/tag/what-is-smart-electricity)

See all

### Recent Posts

### About Us

**POWEReasy automates electrical safety**

POWEReasy is an IOT enabled device that not only monitors electrical conditions but also identifies all 20 electrical faults. It has the ability to isolate the electrical supply and even diagnose and report issues via the cloud.

### Links

- [About us](https://www.powereasy.in/about-us/#)
- [Product](https://www.powereasy.in/fire-prevention/smart-electrical-auditor-three-phase/)
- [Solution](https://www.powereasy.in/fire-prevention-solutions/)
- [Case Study](https://www.powereasy.in/case-study/)
- [Inquire Now](https://www.powereasy.in/inquire-now/)

### Contact Us

 +919699309799

[info@jhaverilabs.com](mailto:info@jhaverilabs.com)

 Jhaveri Power Labs,  
225, A to Z Industrial Estate, G. K. Marg, Worli   
 Mumbai, Maharashtra 400013

Copyright 2026 | Designed with  by [POWEReasy](http://www.powereassy.in)